[Case Study] Achieving Short Delivery Times through the Engagement of Multiple Local Contractors
Elimination of one process in the pressing operation due to improvements in the mold! Introducing a case study from Tsubameki Co., Ltd.
We would like to introduce a case study of Tsubame Kiko Co., Ltd., which performs cleaning, welding, polishing (grinding), assembly, and inspection of metal products. Our company aimed to achieve short delivery times by outsourcing to multiple local contractors. As a result, we were able to eliminate one step in the pressing process through mold improvements, successfully reducing technical costs by approximately 30 yen per unit due to labor savings. [Overview] ■ Achieved short delivery times through outsourcing to multiple local contractors ■ Results - Successfully reduced technical costs by approximately 30 yen per unit due to labor savings *For more details, please refer to the PDF document or feel free to contact us.
- Company:燕器工 本社
- Price:Other